TR-24 Cyclotrons
The TR-24 is a cost-effective solution for the production of PET and SPECT radioisotopes for both commercial users and research institutions.
The TR-24 is a medium energy (18-24 MeV), high current cyclotron manufactured on the platform of our highly successful TR-19 system. The TR-24 bridges the gap between PET cyclotrons and larger 30 MeV cyclotrons. The additional energy and current available with this configuration allow the TR-24 to produce commercial quantities of SPECT isotopes such as I-123, In-111, Ga-67, Ge-68 as well as copious quantities of the traditional PET isotopes.
Features of the TR-24
A wide range of therapeutic and research radioisotopes available, including:
-
PET: 11C, 13N, 15O, 18F,124I, 64Cu, 68Ge
-
SPECT: 123I, 111In, 67Ga, 57Co, 99mTc
-
Capital equipment, facility and operation cost comparable to PET site
-
Up to 16 targets maximize production flexibility
-
Beamlines and high current targets allow for maximal beam utilization
The Economics of TR-24 Cyclotrons
PET | TR-24 | 30 MeV | |
---|---|---|---|
YOUR FACILITY COSTS | $2M – $4M + Cyclotron* | $2M – $4M + Cyclotron* | $8M – $15M + Cyclotron* |
MAINTENANCE & OPERATIONAL COSTS | $50K – $300K/yr* | $50K – $300K/yr* | $500K – $1M/yr* |
OPERATING STAFF | 2-4 Operators | 2-4 Operators | 4-10 Operators |
RADIOISOTOPES | PET | PET & SPECT | PET & SPECT |
*Prices are estimates based on historical data.
Innovation in Design
- Reduced physical dimensions: the PET cyclotron footprint for PET/SPECT capability
- Modular upgrades (targetry, beamlines) allow the system to expand as the requirements of the facility grow
- 300 microamp of total extracted proton beam current is guaranteed
- External ion source allows the current output to be upgraded to a maximum current of 1mA
- The cryo-pumped vacuum system provides high beam transmission and results in minimal cyclotron activation
- Over-specified components
Operational Focus
Safety, ease of maintenance and maximized uptime are the foundation of the TR-24 design philosophy:
- Personnel safety is assured via an extensive software and hardware interlock system
- Fully automated start-up operation routines
- External ion source and removable extraction probes allow for rapid maintenance with low downtime and minimal radiation exposure to personnel
- Access to internal parts is not required during routine service
- Cyclotron does not need to be opened for several years at a time